Capacity:20.000 kg with 125.000 kg it depends on customer and use specifyType:(GLY2)- 2 Axle Front Load Lowbed Semi-Trailer(GLY3)- 3 Axle Front Load Lowbed Semi-Trailer(GLY4)- 4 Axle Front Load Lowbed Semi-Trailer(Option:Pool and flat platform semi-trailer for front load low loader)Axle Unit:Front Load Lowbed Semi-Trailer is produce according to capacity or design.Tire Unit And Dimension:235/75 R 17,5" , 295/60 R 22.5 or 12 R 22.5Lowbed Chassis:Folding Gooseneck Low Loader has been produced in welding constructions with gas metal arc welding as "I" crossing from high resistant steel considering overloads proper to capacity and intended usage.Axles:12-14-16-18 Tons capacity, air suspansion, layer leaf is spring or tandem suspansion.Brake:Brakes system is used according to the standards EEC 97/12, double-circuit pneumatic, EBS, WABCO is brand.
| Kategorie | Tiefladers |
| Marke | GT Semi Trailers |
| Modell | GTY3 |
| Baujahr | 2024 |
| Allgemein bedingung | Neu |
| Optisch bedingung | Neu |
| Technisch bedingung | Neu |











